Abstract

The problem of optimum short-range scheduling of an integrated-hydro-thermal electric power system with variable head hydro plants is considered. The scheduling problem involves the solution of the coordination for an arbitrary hydro plant performance model. Of the many models available, the Glimn-Kirchmayer model and the Hamilton-Lamont model are selected for use in deriving optimality conditions for the problem. The Newton-Raphson method is the basis of an algorithm developed solving the problem of optimal power scheduling iteratively. The authors report on the effect of the form of the hydro plant model on the resulting optimal scheduling. Several test systems are used to examine model effects in terms of optimal fuel cost, thermal and hydro generation and transmission losses. Effects of the models on the convergence properties of the algorithm and a comparison of execution times are also reported.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.