Abstract

Project management strategy research has focused on the effects of structure and planning operations (such as budgets, date completion and quality) on project success. In the past, projects have been managed as technical systems instead of behavioral systems. Relatively little attention has been paid to human resource factor. However, the Project Management Institute in its official definition of Project Management Body of Knowledge (P.M.B.K.) included human resource management as one of the six fundamental basic functions of project management. 1 In this arena which lacks theoretical foundation, a relatively recent study made the situation even worse. Pinto and Prescott (1988) concluded that the ‘Personnel factor’ (independent variable) was the only factor in their research that was marginal for project success (dependent variable). This paper takes a critical look at this research and attempts to respond to their controversial findings. The main objective is to improve the thinking aspects and to highlight the validity of the measures used.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.