Abstract

ABSTRACT During a three-year study of two tributaries being crossed by a four-lane highway under construction in the eastern panhandle of West Virginia, we found little difference in the amount of fine sediment collected at upstream and downstream sites. The downstream site on one tributary collected significantly greater amounts of sediment in 2003, prior to installation of sediment fencing. Despite several episodic flow events that caused changes in the streambed, benthic macroinvertebrate metrics did not differ significantly annually or seasonally between sites or between streams. On-site controls effectively checked new sedimentation, and benthic macroinvertebrates were not significantly impacted.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.