Abstract

This paper presents construction planning procedures for a new small (temporary) or permanent distribution substation to replace an existing distribution substation that is served as a small or permanent substation to supply the load of the existing distribution substation while it has not yet been removed. In the meantime when the ground grids of the two substations are electrically disconnected, the auxiliary grounding system of the existing distribution substation can create steep ground potential rise between the ground grids of the two substations and hence introduces a risk for those who are working nearby. It is therefore important to incorporate safety criteria described in terms of step and touch voltage into electrical designs without any potential electrical hazards. Modeling and simulation is carried out on the Current Distribution Electromagnetic interference Grounding and Soil structure (CDEGS) program. A sequential transition process from the existing distribution substation to a new distribution substation is suggested to comply with the IEEE standard 80-2000. The results in this paper could be served a guideline in grounding system design of distribution substation and modification of grounding standards in MEA’s power distribution system.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call