Abstract
This study investigated the effects of enhanced biological phosphorus removal (EBPR) on rapid sludge bulking control and fast aerobic granular sludge (AGS) formation by adding 20 % of EBPR activated sludge to the bulking activated sludge (BAS) reactor. The results indicate that activating EBPR activity swiftly improved BAS settleability within 16 days, thus resolving sludge bulking issues. Subsequently, a settling time-based selection was employed, resulting in the BAS granulation within another 16 days. The rapid achievement of EBPR activity improved the BAS settleability and facilitated the formation of sludge aggregates, thereby expediting BAS granulation. Inhibition of filamentous bacteria and enrichment of slow-growing organisms contributed to both sludge bulking control and aerobic granulation. Furthermore, the increase in proteins/polysaccharides ratio facilitated the granulation process. Additionally, total nitrogen removal increased from 59.4 % to 71.7 % because of the mature AGS formation. This study provided an approach to simultaneously control sludge bulking and promote aerobic granulation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.