Abstract

This study investigated the effects of enhanced biological phosphorus removal (EBPR) on rapid sludge bulking control and fast aerobic granular sludge (AGS) formation by adding 20 % of EBPR activated sludge to the bulking activated sludge (BAS) reactor. The results indicate that activating EBPR activity swiftly improved BAS settleability within 16 days, thus resolving sludge bulking issues. Subsequently, a settling time-based selection was employed, resulting in the BAS granulation within another 16 days. The rapid achievement of EBPR activity improved the BAS settleability and facilitated the formation of sludge aggregates, thereby expediting BAS granulation. Inhibition of filamentous bacteria and enrichment of slow-growing organisms contributed to both sludge bulking control and aerobic granulation. Furthermore, the increase in proteins/polysaccharides ratio facilitated the granulation process. Additionally, total nitrogen removal increased from 59.4 % to 71.7 % because of the mature AGS formation. This study provided an approach to simultaneously control sludge bulking and promote aerobic granulation.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call