Abstract
ABSTRACT One strategy to reduce inventories and increase on-time delivery is to use Advanced Demand Information (ADI) in which customers place their orders ahead of their due date. ADI can be divided into perfect or imperfect information. Under perfect ADI, customers send accurate demand information to the suppliers, specifying exact quantities and due dates. Under imperfect ADI, customer orders’ quantities and/or due dates may change over time or order cancellations may occur. This research focuses on the effects of three types of imperfect ADI on different production systems: changing due dates, changing order quantities, and cancellations. Three different model variations simulate a pull system, a push system, and a hybrid system. We found that only cancellations and changing order quantities had a significant effect on system performance. Generally, the pull and the hybrid system behaved similarly and proved to be more suitable for managing imperfect ADI than the push system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.