Abstract

In this paper, we develop a testable holistic procurement framework that examines how a broad range of procurement related factors affects project performance criteria. Based on a comprehensive literature review, we put forward propositions suggesting that cooperative procurement procedures (joint specification, selected tendering, soft parameters in bid evaluation, joint subcontractor selection, incentive-based payment, collaborative tools, and contractor self-control) generally have a positive influence on project performance (cost, time, quality, environmental impact, work environment, and innovation). We additionally propose that these relationships are moderated or mediated by the collaborative climate (i.e. the trust and commitment among partners) in the project and moderated by the overall project characteristics (i.e. how challenging the project is in terms of complexity, customization, uncertainty, value/size, and time pressure). Based on our contribution, future research can test the framework empirically to further increase the knowledge about how procurement factors may influence project performance.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.