AbstractTeams that deliver complex transportation construction projects need tools that manage risk and allow for successful delivery. Construction manager/general contractor (CM/GC) project delivery is an alternative method that furnishes public agencies with an attractive option for delivering projects in a less adversarial and more constructive manner by involving the contractor during the design phase. This paper identifies the effects of CM/GC delivery on construction process risk. Owners, contractors, and design engineers with sizable CM/GC experience on transportation-related projects were surveyed to identify differences in the perception of CM/GC processes, especially compared to design-build and design-bid-build project delivery methods. The perceived benefits and disadvantages regarding quality, schedule, cost control, and collaboration/flexibility are discussed. The benefits include strategies for robust process risk management and successful project delivery, while the disadvantages expose ba...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.