Abstract

Very few data are available on the sediment yield of Alberta watersheds especially in the northern portion of the province. In the 175 000 km2 Peace River basin, which covers about 25% of Alberta, sediment data are collected regularly at only four stations. One of these is the 112.7 km2 Spring Creek watershed. In 1977 a pipeline was installed near the mouth of Spring Creek, disturbing an area of about 5000 m2 near the stream channel. The effects of this were to increase local sediment yields by over 1600 Mg in a 4 month period. This compares with regional averages for the Peace River basin of 18–88 Mg∙km−2∙year−1. The study indicates the magnitude of spatial variation of sediment production and shows some effects of geotechnical activities on sediment yields.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.