Abstract

OAO Koks has introduced a comprehensive program for more stable plant operation and reduced environmental impact in the period 2004–2010. Methods of group relining of the coking-furnace chambers and hot repair of coke furnaces with complete relining of the heating walls have been adopted. Water-protection measures include the construction of an additional water-circulation cycle for the chemical shops, completion of the first stage of wastewater treatment, and reconstruction of the biochemical processing system for phenolic and oily water. A mobile environmental station has been acquired for air-quality monitoring.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call