Abstract

As a State-Owned Enterprise, PLN must provide sufficient quantity and quality electricity for the public interest. Still, on the other hand, according to the articles of association, PLN is required to make a profit. Power transformer failures significantly impact electrical system reliability, as they can disrupt electricity delivery. Many studies have been conducted on the health index of power transformers. However, previous studies only considered health indexes from one or several aspects of testing results. Life Cycle Cost is a method that helps select the best cost approach for establishing an effective maintenance strategy over the transformer's lifetime. A transformer lifetime uses a Weibull Analysis of a failure transformer in PLN TJBT from 2017-2022. This study uses a comprehensive health index by considering failure modes in transformers that integrate results from various aspects, such as observations while in operation, field inspections, and on-site and laboratory testing. After conducting a comprehensive health index, a risk evaluation was performed to simulate the impact of different maintenance decisions. Considering the health index and life cycle cost of the transformer, a new maintenance decision-making model was developed to choose the best maintenance strategy based on the current condition of the transformer.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.