Abstract

This paper is concerned with non-preemptive scheduling of large-scale unrelated parallel machines (UPM) with the objective of minimizing total weighted completion times (TWCT). We propose a sequential improvement local search algorithm using multiple-jump strategy embedded within Tabu search (TS) components for TWCT, and use a highly efficient data structure to provide a necessary and sufficient condition for local optimality of a solution. We will generate a set of large-scale test problems to evaluate the performance of proposed algorithm in term of scalability, solution quality and efficiency. The non-parametric tests of algorithm components will be used to validate the consistent performance across problem types and problem sizes in the proposed algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.