Abstract

This study addresses the single-machine scheduling problem with a common due window (CDW) that has a constant size and position. The objective is to minimise the total weighted earliness–tardiness penalties for jobs completed out of the CDW. To determine a schedule as close to optimum as possible, this study develops a dynamic dispatching rule and an effective constructive heuristic. The better performance of the proposed heuristic is demonstrated by comparing the results of it with those of a state-of-the-art greedy heuristic on a well-known benchmark problem set. In addition, we incorporate the constructive heuristic into a best-so-far meta-heuristic to examine the benefit of the proposed heuristic. The results show that the best known solutions in 144 out of the 250 benchmark instances are improved.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call