Abstract

In order to analyze the influence rule of water pipe cooling on the temperature field and thermal stress of large aqueduct structure, the finite element analysis model for FuYang River Aqueduct structure was established. The temperature field and thermal stress of the aqueduct structure were calculated. The following two cases were considered: structure with or without water pipe cooling, as well as the different beginning pouring months (May, June and July). The hydration-degree-based calculation methods of temperature and stress of concrete were adopted, and the high precision discrete simulation method of water pipe was used. The calculation results show that embedding the cooling pipe in concrete can effectively reduce the temperature difference between inside and outside of the early concrete and thermal stress, and is therefore effective to prevent concrete cracks. High accuracy of simulation and analysis can make people basically figure out the specific mechanism of concrete cracking and main factors even before construction, and determine accurately the structure crack location and the developing tendency.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.