Abstract
Water-based polymer drilling fluids are commonly used for drilling long horizontal wells where eliminating the drilling fluid-related formation damage and minimizing the environmental impact of the drilling fluids are the main concerns. An experimental study was conducted to investigate the turbulent flow of a polymer fluid over a stationary sand bed deposited in a horizontal pipeline. The main objectives of the study were to determine the effects of sand particle size on the critical velocity required for the onset of the bed erosion and the near-wall turbulence characteristics of the polymer fluid flow over the sand bed. Industrial sand particles having three different size ranges (20/40, 30/50, 40/70) were used for the experiments. The particle image velocimetry (PIV) technique was used to determine instantaneous local velocity distributions and near-wall turbulence characteristics (such as Reynolds stress, axial and turbulence intensity profiles) of the polymer fluid flow over the stationary sand bed under turbulent flow conditions. The critical velocity for the onset of the particle removal from a stationary sand bed using a polymer fluid flow was affected by the sand particle size. The critical velocity required for the particle removal from the bed deposits did not change monotonously with the changing particle size. When polymer fluids were used for hole cleaning, the particle size effect on the critical velocity varied (i.e., critical velocity increased or decreased) depending on the relative comparison of the sand particle size with respect to the thickness of the viscous sublayer under turbulent flow condition.
Highlights
The deposition of drilled cuttings on the low side of the well is inevitable when drilling long horizontal or extended reach wells
This paper summarizes the results of a follow-up study, where we used a water-based polymer fluid for the particle removal from the sand bed deposited in a horizontal pipeline
Frictional Pressure Drop Measured for the Polymer Fluid Flow over the Sand Bed
Summary
The deposition of drilled cuttings on the low side of the well is inevitable when drilling long horizontal or extended reach wells. If the cuttings are not sufficiently cleaned, operational problems such as slow drilling rate, excessive torque and drag, bridging, pack-off, hole fill, and a pipe stuck would occur [1,2,3]. Drilling needs to be interrupted occasionally to clean the well from cuttings, this costs time and money. Hole cleaning and the bed erosion process in annular geometry have been extensively studied in the past. Brown et al [4] studied the hole-cleaning performance of water and some polymer-based fluids through a set of experiments conducted using a specially designed flow loop. Martins et al [5]
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.