Abstract

Isothermal conduction calorimetry has been used to monitor the early hydration of Portland–blastfurnace slag (BFS)‐blended cements. Portland:BFS composite cements with ordinary Portland cement replacements from 0 to 90 wt% were studied at curing temperatures from 12° to 90°C. Peak II, principally associated with alite (Ca3SiO5) hydration, was accelerated with increasing temperature for all blends. Peak S, associated with BFS hydration, was particularly noticeable at 40° and 60°C. At higher curing temperatures, peak S merged with peak II, indicating thermal activation of BFS. Novel plots of total heat output against percentage replacement show that BFS contributes to the heat of hydration, even at temperatures below its thermal activation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.