Abstract
The effect of installing steam-injected gas turbines in a cogeneration plant is analyzed with respect to unit sizing and operational planning. An optimization method is used to determine the capacities of gas turbines and other auxiliary machinery in consideration of their operational strategies for variations of electricity and thermal energy demands. Through a numerical study on a plant for district heating and cooling, it is clarified how the installation of steam-injected gas turbines in place of simple-cycle ones can improve the economic and energy-saving properties. The influence of the capital cost of steam-injected gas turbines on the unit sizing and the above-mentioned properties is also clarified.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.