Abstract

We evaluated the long-term (18 year) and short-term (4 weeks) changes of Sb in contaminated soil with SOM increase under remediation process. In the Aznalcóllar mine accident (1998) contaminated area, the remediation measurement implemented the Guadiamar Green Corridor, where residual pollution is still detected. Soils of the re-vegetated area (O2) with high pH and high SOM content, moderately re-vegetated area (O1) and unvegetated area (C) were sampled. Soil pH, CEC, SOM amount and soil Sb forms were evaluated. Soil Sb was measured as total, soluble, exchangeable, EDTA extractable, acid oxalate extractable, and pyro-phosphate extractable fractions. Further, the short-term effect of artificial organic matter addition was also evaluated with incubation study by adding compost to the sampled soil from C, O1 and O2 areas. After 4 weeks of incubation, soil chemical properties and Sb forms were evaluated. In re-vegetated area (O2), soil total Sb was two times lower than in unvegetated area (C); however, soluble, exchangeable, and EDTA extractable Sb were 2–8 times higher. The mobile/bioavailable Sb increase was also observed after 4 weeks of incubation with the addition of compost. Soluble, exchangeable, and EDTA extractable Sb was increased 2–4 times by compost addition. By the linear regression analysis, the significantly related factors for soluble, exchangeable, and EDTA extractable Sb values were pH, CEC, and SOM, respectively. Soluble Sb increase was mainly related to pH rise. Exchangeable Sb should be bound by SOM-metal complex and increased with CEC. EDTA extractable fraction should be increased with increase of SOM as SOM-Fe associated Sb complex. From these results, it was shown that increase of SOM under natural conditions or application of organic amendment under remediation process should increase availability of Sb to plants.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call