Abstract
Cement asphalt mortar (CAM) softening is a common phenomenon that results from aging and rain soaking when a high-speed railway is in service. CAM softening seriously affects vehicle operation safety and track dynamics. In this paper, a 3D coupling dynamic model of a vehicle and a China railway track system I (CRTS-I) slab track is developed. By using the proposed model, the wheel-rail contact forces, derailment coefficient, wheelset loading reduction ratio, and the track displacements are calculated to study the influences of CAM softening on the dynamic characteristics of a vehicle-track system. A track-subgrade finite difference model is developed to study the effect of CAM softening on track damage. The results show that track interface shear failure develops when the CAM softening coefficients reach 10–100. The CAM softening coefficient should not be less than 1000, otherwise a high-speed running vehicle may risk derailment.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.