Abstract

This work presented in this paper is based on the simulation of the routing flexibility enabled manufacturing system. In this study four levels of each factor (i.e. routing flexibility, system load conditions, system capacity and four part sequencing rules) are considered for the investigation. The performance of the routing flexibility enabled manufacturing system (RFEMS) is evaluated using three performance measures like make-span time, resource utilization and work-in-process. The analysis of results shows that the performance of the manufacturing system may be improved by adding in routing flexibility at the initial level along with other factors. However, the benefit of this flexibility diminishes at higher levels of routing flexibilities.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.