Abstract

Differential settlements often occur between bridge abutments and the approach embankments either because the soil underlying the embankment consolidates or because the pavement and embankment materials are compressible and the bridge deck is essentially rigid. This causes a “bump” to form at the approach abutment, and so many bridges are provided with approach slabs, the purpose of which is to span across any difference in level caused by differential settlement between the embankment and the bridge. Repeated traffic loadings can, however, produce a new bump at the end of the slab. To overcome this problem, approach slabs can be constructed at an angle to the horizontal, sloping down beneath the pavement. The varying thickness of base course above the slab produces a graded deformation in the pavement and results in a smoother riding surface. Model pavements and approach slabs have been tested in a laboratory‐scale test track, and these tests have shown the effectiveness of sloping approach slabs in redu...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.