Abstract

Among the input data required for systems economically lead scheduling is the forecasted load . The uncertainty in forecasted load is of the main factors affecting economical load scheduling (E.L.S.) problems. This paper presents the solution of E.L.S. problem for electrical power systems. The plants limitations , demand and transmission constraints are of the factors considered. Factors influencing forecasted load load uncertainty are illustrated. Mathematical formulation and comprehensive analysis for corrections must be made to E.L.S. due to incremental load chaages are introduced.

Highlights

Read more

Summary

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.