Abstract

In this study, a comparison of methane (CH4) generation rates for two test cells, one operated with (enhanced) and another without leachate recirculation at Odayeri Sanitary Landfill were compared using their bio-chemical methane potentials (BMP). Initial methane potential is approximately 34.5 m³ CH4/wet ton of solid waste. The remaining methane potential for the control (C1) and the enhanced (C2) cells are 32.6 m³ CH4/wet ton and 31.1 m³ CH4/wet ton of refuse after eight months of operation, respectively. The produced CH4 quantities for C1 and C2 after eight months of operation are 1.9 m³ CH4/wet ton and 3.4 m³ CH4/wet ton, respectively. On the other hand, 5.5% and 9.9% of the total potential are generated in eight months. However, the CH4 generation rates for the first year are determined as 2.85 and 5.10 m³/ton/year for C1 and C2 test cells, respectively. Due to the appropriate conditions such as moisture content, solid waste decomposition rate is enhanced at a rate of 79% at C2 test cell relative to C1 test cell. Hence, C2 test cell shows more decomposition relative to the C1 test cell.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call