Abstract

Among promising cooling options, flow boiling in micro-structures is a strong alternative. However, for systems operating under very high heat loads, any shortage or discontinuity of working fluid can lead to irreversible problems and system failure. Hence, here, this problem is addressed; and as the first time, effect of intermittent interruption of fluid supply on flow boiling phenomenon in expanding cross sectional heat sinks with micro pins and cavities (EHSPC) is experimentally studied. In addition to EHSPC, a classical heat-sink having parallel channels (PHSC) is used for comparison. Different downtimes (DT), more clearly, time for duration of interruption of water flow (0, 3, 6, 9, 12 s), heating powers (145 and 200 W) and heat sinks (EHSPC and PHSC) constitute variable conditions, while mass flux (G = 180kgm−2 s−1) and inlet temperature (Ti = 73 °C) are constant conditions. As conclusion, for pump-failure conditions, EHSPC can successfully manage cooling process. Simultaneous existence of micro-cavities, micro-pin-fins and enlarging cross-section successfully tolerates time-period at which pump doesn't work. The magnitude of quasi-sinusoidal type oscillations of EHSPC is significantly small compared to those obtained for PHSC. Compared to PHSC, enhancement percentage of htp in favor of EHSPC are 19.2 %, 33.9 %, 44.1 % and 119.5 %, respectively for DT = 0, 3 s, 6 s, and 9 s.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.