Abstract
Abstract The fluctuating pressure generated by the instantaneous starting pump of cementing operation might easily cause formation fracture in narrow safety window formations. Accurate transient fluctuating pressure calculation and dynamically managed backpressure are required to achieve precise control of wellbore pressure in managed pressure cementing. Considering the transient flow characteristics of cementing fluids in the wellbore, unsteady transient friction, and the variation of high pressure-high temperature (HTHP) cementing fluid properties, a transient flow mathematical model of instantaneous starting pump during managed pressure cementing is established, and the method of characteristics is used for solution. Based on tht established model analyzes the magnitude and variation of wellbore pressure under different model factors, temperature conditions, pump start duration, and target pump flowrate, which can achieve more accurate analysis of transient flow. The pressure and flow fluctuations generated during the instantaneous starting pump of cementing are significant, and the dynamically managed wellhead backpressure can effectively control the wellbore pressure in the safe pressure window formations. This can reduce the risk of well leakage and provide reliable technical support for safe operations of instantaneous starting pumps during managed pressure cementing.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.