Abstract

The initial curing of concrete specimens for quality assurance is addressed in different ways in testing standards, which often specify requirements that are difficult to meet in practice unless very costly initial curing chambers are available. The failure to meet these requirements in many areas of the world does not appear to result in adverse consequences. This study analyzed six initial curing temperature schemes, all with cycles similar to natural conditions to avoid the simplifications inherent in constant temperature curing. Three strengths of concrete and two initial curing times (24 and 72 hours) were used in this study. The findings in this paper showed that initial curing time had no effect on 28-day strength. The 28-day strength also proved to be resilient to maximum and minimum initial curing temperatures outside the limits stated in the standards considered in this study.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.