Abstract

There are risks in every construction project, uncontrolled risks will become a problem and cause losses to the project due to cost overruns and delays in work execution. Therefore, to manage risk, it is necessary to carry out risk management so that the project can survive, or perhaps optimize risk. The purpose of this study was to determine the dominant risk factors, how big the level of risk that occurred and the response given to the dominant risks of cost and time performance in the structural work of the Grand Jati Junction Apartment Development project. From the results of this study, it was found that 8 factors became the dominant risk factors with varying (different) levels depending on the complexity of the work and the conditions at the time of implementation of each stage of the work. Then from the results of the risk factor analysis, a risk response is obtained in the form of preventive measures to prevent or minimize these risks. Keywords: Risk Management, Building Structure Work.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.