Abstract

An optimization method based on a dynamic linear programming tool for determining best load distributions over distinct units of a fuel oil-fired power plant is presented. Two approaches are analyzed in this work. In the first approach, the objective function is based upon a minimization of the fuel consumption by the power plant. The second approach aims to minimize the total operational costs, i.e. the sum of the internal (or fuel) boiler costs and the external costs (or costs of damage done by the power plant to the environment and humans). The model used as the basis of the optimization also takes into account the changes in key operating variables as well as boiler efficiency with load variations. A 1330-MW fuel oil-fired power plant is the focus of the study. The method is applied to data from the power plant for the three climatic seasons in Thailand and two fuel options (dependent on the fuel grade). The optimum time-domain loading of the power plant units is strongly affected by the objective function, thermal cycle efficiency of the individual units and grade of fuel oil fired in the boilers. It was shown that application of the optimization method can reduce the total costs by 0.3-0.9% depending upon the seasons and fuel options.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.