Abstract

An energy dissipation on hydraulic structures is a scientifically highly examined field of study. Gained knowledge can be used to ensure the safety of the hydraulic structures and the channels which is crucial during floods. Above that, those structures are also part of the critical infrastructure therefore their function is necessary. It is assumed that in the Czech Republic the precipitation distribution is changing due to climate change thus episodes of extreme floods may be observed more often. The paper brings brand new knowledge on the kinetic energy dissipation on the chute and in the stilling basin and its impact on the riverbed scour hole development. The presented research was conducted in the Water Management Experimental Centre of Czech Technical University in Prague, Faculty of Civil Engineering. The research aimed to examine the energy dissipation mechanism on different geometric modifications of the construction of spillway chute and stilling basin and its impact on the process of scour hole development. These various types of dams’ flood safety equipment were examined in the hydraulic laboratory: an elementary form of the spillway without any stilling basin; the elementary form of the spillway and the stilling basin (crest and spillway channel had the same width); the chute width was reduced, and the stilling basin had the full width; steps were added on the narrowed chute and the and stilling basin had the full width; only the spillway crest was reduced to a half-width; only the stilling basin width was smoothly reduced; the chute’s width was smoothly reduced along the chute and the stilling basin had full width; the chute’s width was smoothly reduced along the chute and the stilling basin had the width reduced to a half. The flow, water levels, scour hole and deposit dimensions were measured. Then the amount of energy dissipated was computed. The correlation and connection between energy dissipation and scour hole development was investigated. These outcomes can be used as a recommendation of an appropriate construction design to provide better flood safety of the hydraulic structure.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call