Abstract

Based on beam specimens of 100mm×100mm×400mm, the effect of electrochemical chloride extraction (ECE) on bond performance between steel bar and concrete contaminated by chloride was studied by determining the bond strength of them. During the test, 1%, 2% and 3% NaCl by weight of cement were mixed into concrete to simulate chloride contamination. In the process of ECE, four kinds of current density (1, 2, 3, 5 A/m2of steel bar area) and electric quantity (500, 1000, 1500 and 3000 A.h/m2of steel bar area) were taken into account, respectively. It is indicated that the bond strength between steel bar and concrete was degraded after ECE treatment, the more the current and the electric quantity of ECE are, the more the loss of bond strength is, and the initial content of chloride in concrete has a little influence on the bond strength.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.