Abstract

Weak link (WL)/strong link (SL) systems constitute important parts of the overall operational design of high-consequence systems, with the SL system designed to permit operation of the system only under intended conditions and the WL system designed to prevent the unintended operation of the system under accident conditions. Degradation of the system under accident conditions into a state in which the WLs have not deactivated the system and the SLs have failed in the sense that they are in a configuration that could permit operation of the system is referred to as loss of assured safety. The probability of such degradation conditional on a specific set of accident conditions is referred to as probability of loss of assured safety (PLOAS). Previous work has developed computational procedures for the calculation of PLOAS under fire conditions for a system involving multiple WLs and SLs and with the assumption that a link fails instantly when it reaches its failure temperature. Extensions of these procedures are obtained for systems in which there is a temperature-dependent delay between the time at which a link reaches its failure temperature and the time at which that link actually fails.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.