Abstract

Background: PT. X implements a daily trip method that takes ±1,5 hours to arrive at the offshore platforms. Travel time that’s too long can cause fatigue. Purpose: Analyzing the effect of a daily trip system on PT. X contractor worker fatigue at offshore site. Method: This research was conducted at one of PT. X’s offshore Gresik Sites in June 2021 used Fatigue Assessment Scale (FAS) questionnaire with observational analytics method and cross-sectional study design. Research samples were taken from the population of 153 construction workers PT. X at offshore site. The data obtained were analyzed using quantitative approach, data analysis used univariate analysis and bivariate analysis, chi-square statistical test with significance value or confidence interval was 95% and error interval was 5% (CI = 95% and α = 0.05). Result: PT. X Contractor workers at the offshore site had 85 workers (55.56%) that get fatigue. Statistical analysis test showed there was no significant relationship between a daily trip system with fatigue on PT. X Contractor workers at the offshore site (p-value = 0.140). Factors that affect fatigue on PT. X Contractor workers at the offshore site were age, body mass index, and workload (p-value successive were 0.047, 0.014, and 0.001). Conclusion: A daily trip system has no effect with fatigue on PT. X contractor worker at the offshore site, recommended for the contractor to improve the BMI and manage the workload so that its more evenly distributed.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call