Abstract

On the basis of the engineering background of cross passage construction in the Chen Yu Tunnel project, the collapse section above the intersection of the existing tunnel is selected to establish finite element model. Considering the effect of cross passage construction and the local weakening area of surrounding rock on the safety of existing tunnel structure, the strength of the shotcrete supporting structure of existing tunnel intersection is checked, and the security of the existing tunnel is evaluated. This research is of great practical significance and a certain reference value for the plan and design upon the construction of tunnel engineering.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.