Abstract
Nathan Cohn's newly proposed technique of coordinated, system-wide correction of time error and inadvertent interchange is examined and validated by computer simulations. Area and system performances are investigated for a sudden change in load or generation in a three-area power system. The following effects are examined: changing the time of correction; simultaneous versus individual correction of time error and inadvertent interchange; the type of disturbance; the governor delay time; and the presence of sustained errors.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.