Abstract

Summary The paper describes the Demonstration System suggested by the authors. This Demonstration System enables efficient performance of alternative life-time process planning, multicriteria assessment, utility degree determination and selection of the most efficient versions of various projects and their constituent parts: • Determination of rational design solutions for walls, windows, roof structures, basement floor, heating system. • Selection of rational constituent parts of a project (selection of construction site and location, multipurpose complex assessment of buildings, determination of rational types of contracts). • Selection of efficient interested parties (contractors, suppliers, neighbours). • Alternative designing of life-time process of a project (one-family dwelling houses; agricultural, cast-in-place, prefabricated panel, and thermal renovation of buildings), its multicriteria assessment, determination of utility degree and selection of the most efficient version: • Determination of ef...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.