Abstract

One purpose of this study was to determine if by correlating each component of a multiple schedule with delays-of-reinforcement of either 0, 2, 4, or 8 s, a within-session delay-of-reinforcement gradient could be obtained. Reinforcement was delivered on each component using a tandem schedule composed by a random interval that added to each nominal delay yielded a constant interreinforcement interval (IRI) of either 32 or 128 s. Three pigeons were assigned to each IRI. Response rates in each component of the multiple schedules decreased gradually as the reinforcement delay was lengthened. A second purpose was to determine the point on a continuum defined by the probability of signaling the delay period p(signal) at which frequency-of-reinforcement effects become relative-time effects in a reinforcement-delay procedure. The p(signal) was either 0.00, 0.33, 0,66 or 1.00. When p(signal) was 0.00, global response rates for any given delay were higher with the 32 s than with the 128 s IRI, showing a frequency-of-reinforcement effect. When p(signal) was increased from 0.33 to 1.00 global response rates for any given delay were higher with the 128 s than the 32 s IRI, showing a relative-time effect.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.