Abstract

This report is the Final Technical Progress Report for ERDA Contract No. E(49-18)-2353 for the EDS (Exxon Donor Solvent) Coal Liquefaction Process Development--Phase IIIA. The contract and this report covers the eighteen-month period January 1, 1976 through June 30, 1977. Funding is shared by ERDA, the Electric Power Research Institute, and Exxon Research and Engineering Company. This Final Report is presented in two volumes: volume I contains the Laboratory Process Research and Development contribution and includes Technical Reporting Categories 1 to 7 and the Appendices for these sections; volume II contains the Engineering Research and Development contribution and includes Technical Reporting Categories 8 to 11. Results are presented under eleven activities: operation of recycle coal liquefaction units; operation of the one ton per day liquefaction pilot plant; solvent hydrogenation studies; bench-scale units, modeling and correlation studies; product quality studies; coking and gasification studies; construction and operation of the 2 barrel per day coking/gasification pilot plant; commercial study design and cost estimate; cost reduction and laboratory guidance study; pyrolysis and gasification engineering studies; and engineering technology studies.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.