Abstract

The City of Edinburgh in Scotland in the UK had advanced plans for a congestion charging scheme until 25 February 2005. However, these plans were abandoned at that time after a referendum that resulted in a ‘no vote’. This paper explains the origins of the scheme, outlines its nature, extent, charging technology and predicted effect; it also analyses the difficulties that exist when attempting to plan and implement such a scheme in a particular governance context, and when there is little unanimity of public opinion about the need for a scheme. As well as the primary documentation from the proposals (e.g. public inquiry submissions, papers to government), the paper also draws upon a series of face-to-face interviews that were undertaken with key stakeholders. It also provides an analysis of press coverage in the local (Edinburgh) and national (Scottish) newspapers in the run-up to the referendum. These sources explain both the systemic and more local barriers to the scheme's implementation. The paper draws key lessons which are important for authorities considering the implementation of a road user charging scheme, by suggesting how legislative and governance barriers to implementation can be reduced. The lessons are of relevance world wide.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.