Abstract

At the Paul Scherrer Institute (PSI/Switzerland) a new proton gantry for cancer treatment is planned. A fast 3 dimensional scanning technique of the tumor volume is one of the medical highlights of this new gantry. The gantry will be driven by the new COMET proton cyclotron, which will deliver a cw proton beam. The energy of this beam will be adjusted by a fast degrader device. All beam line magnets should follow the energy changes of the degrader as fast as possible. Therefore the eddy current effects in the laminated bending magnets of the beam line and the gantry must be reduced by an appropriate magnet design. The paper shows measurements and numerical simulation of the dynamic behavior of the fast switched bending magnets and design schemes for eddy current reduction in the bending magnets

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.