Abstract

This work presents an assessment of the potential and economical feasibility of adopting off-shore/on-shore wind energy as a renewable source of energy in Qatar. An analysis is presented for the long term measured on-shore wind speed (1976–2000) at Doha International Airport. A similar analysis is presented for the measured off-shore wind speed at the Qatari Haloul Island. For the on-shore measurements, the average annual wind speed (at 20 m height) was found to be about 5.1 m/s. On the other hand, for the off-shore measurements at Haloul, the average annual wind speed was found to be about 6.0 m/s. This result indicates the suitability of utilizing small to medium-size wind turbine generators, efficiently. Such generators can be implemented for water pumping and to produce sufficient electricity to meet vital, limited needs of remote locations, such as isolated farms, which do not have access to the national electricity grid. An economical assessment is presented which takes into consideration the interest recovery factor, the lifetime of the wind energy conversion system (WECS), the investment rate and operation and maintenance costs. The results indicate that the cost of electricity generation from the wind in Qatar compares favorably to that from fossil fuel resources. The feasibility of utilizing off-shore wind turbine systems to meet the power requirements of the island of Haloul and possibly provide additional power for nearby on-shore areas is discussed.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call