Abstract

A discussion of the methods used to determine the most economic design of chimney for a new thermal power station or large industrial plant is presented, with the objective that ground level concentration of pollutants will be kept at a minimum. Attention is paid to the geography and climatology of the site, with special reference to the frequency and height of inversions and the prevailing wind direction and speed. A method is illustrated in using a large thermal power station as an example. The maximum sulfur dioxide concentrations at ground level are computed for several chimney heights and gas exit velocities. The values of these sulfur dioxide concentrations, the capital cost of the chimney, the pumping costs, and the gas pressures within the chimney are considered in selecting a suitable chimney height and a gas exit velocity which will meet most economically the stated objective. The paper deals primarily with chimneys for industrial or power boiler plant of maximum continuous rating greater than 4...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.