Abstract

With respect to the growing share of renewable resources in secure provision of electrical energy, proper utilization of hybrid power plants is of great importance. Therefore, an optimal production planning for operation of these power plants is evidently necessary. Generally, economical load distribution refers to determination of an optimal point in production that fully provides for the total network load. In other words, the economical load distribution refers to cost minimization of the produced electrical power for satisfying the total network demand, with consideration of the actual constraints in the power system. To serve this purpose, several methods have been in use, but with the entry of power plants that use renewable energy resources, necessary steps should be taken to ensure their optimal use. However, economical optimization and sufficient reliability in serving concurrent demands are the two-fold objectives of the electrical power system and need to be considered simultaneously. Therefore, in analyzing the share of renewable energy resources in the total electrical power network, both their economical advantages and their reliable level of production should be considered. Presently, many countries show interest in using hybrid solar power plants and fossil fuel power plants. In this research, the problem of augmenting power networks with solar power plants and finding their optimal production point is dealt with. Some models for the production cost functions of these power plants are presented and discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call