Abstract
In this paper, two economic production quantity (EPQ) models are proposed for deteriorating/imperfect items with rework process. The production process is imperfect, and imperfect quality items are reworked to become serviceable. At the same time, the remaining good quality items may deteriorate. The inspection of deteriorated items is also imperfect, so that deteriorated items may be sold to customers, which will create negative impact on corporate image. In the first model, a single production-rework plant system is considered. The optimal production times and the economic production quantities are obtained analytically. In the second model, a system that consists of n production plants and one rework plant is considered. A solution procedure is developed in order to obtain the optimal operating cost. Numerical examples are provided to compare the performance of the two systems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.