Abstract

In this paper, the economic analysis model of solar chimney power plant combining seawater desalination and waste heat (SCPPDW) and wind supercharging solar chimney power plant combining seawater desalination and waste heat (WSCPPDW) was established. Based on net present value (NPV) method, the economic performance of two systems and that of WSCPPDW after optimization were studied. It was found that the addition of wind supercharging device increased the net income (NET) and NPV by 42.8% and 102.5%, respectively. With the increase of time, the annual NET of two systems increased, and the annual NPV firstly increased and then decreased. The annual NET and NPV of WSCPPDW were always larger than those of SCPPDW, which were negative in the first four years, but those of WSCPPDW were only negative in the first year. After sequentially optimizing the turbine rotational speed, nozzle length, chimney outlet radius and mixing section length, the power and freshwater output of WSCPPDW were improved by 455.8% and 11.7%, respectively. And the total net income (TNET) and total net present value (TNPV) were increased by 183.4% and 442.8%, respectively. The declining inflection point of annual NPV was brought forward by 10 years compared to that of initial WSCPPDW.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.