Abstract

The power industry initially designed 500 kV transmission lines in the early 1960's. Then, as now, cost of losses versus installed cost evaluations were made to assess conductor requirements. At that time, independent of the economic analysis, electrical environmental criteria limited the minimum allowable conductor sizes. That is, radio interference mitigation required larger conductor sizes than did economic requirements. By today's measures, energy was inexpensive, and smaller conductor sizes would have satisfied an optimum balance between initial cost and operation cost.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.