Abstract
In this paper, we report economic feasibility studies focusing on profitability analysis of high pressure polymer electrolyte membrane (PEM) water electrolysis for distributed H2 refueling stations in Korea. From capital and operating costs, a unit H2 production cost of 6.24 $ kgH2−1 was obtained for a H2 capacity of 700 m3 h−1, which is equivalent to handling about 300 fuel cell electric vehicles. Based on cost estimations, profitability analysis using cash flow diagrams was performed to assess the economic feasibility of high pressure PEM water electrolysis and various key economic indicators like net present value (NPV), discounted payback period (DPBP), and present value ratio were obtained for both different discount rates and capacity factors. In conclusion, employment of high pressure PEM water electrolysis was found to be economically profitable showing reasonably high NPVs (16–52 MM$) and short DPBPs (4–7 years).
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.