Abstract

The interstate electric power system, as an alternative for energy cooperation under regional economic block, was fervently debated prior to the restructuring of electric power industries and rapidly expanded in many regions since the 1990s. Especially, electric power system interconnection in the Northeast Asia region may bring considerable economic benefits since this region has strong supplementation in resource holdings, load shape, fuel mix, and etc. In this paper, we implement the ORIRES model, proposed by ESI of Russia, in order to analyze the economic feasibility on the Northeast Asia Region Electrical System Ties (NEAREST) project.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.