Abstract

This work aims at the economic evaluation of a semi-underground pumped hydro storage power plant erected in an abandoned open-pit mine. For the exploratory model-based analysis, we develop and apply both a simple deterministic and a stochastic net present value (NPV) approach, the latter of which uses a Monte Carlo simulation to account for revenue uncertainty from electricity price fluctuations. The analytical framework developed is applied to two promising sites in the Rheinland region in Germany, Hambach and Inden, making reasonable parameter value assumptions and considering and ignoring the lengthy duration of lower reservoir flooding. The investor’s value-at-risk is computed for alternative performance indicators (NPV, net cash recovery, profit-to-investment ratio, and specific production costs) to compare the different outcomes in terms of the project’s financial risk distribution. Calculations show that a semi-underground pumped hydro storage power plant in an abandoned open-pit mine can be constructed at reasonably low investment costs and operated at low specific production costs. However, because the investment has to be made long before the pit lake is (naturally) flooded—a process that for realistic flow rates may take up to 20 years—the project is highly uneconomical and would require substantial subsidies, as compared to a situation where flooding happens immediately.

Highlights

  • Germany is shifting its power production away from fossil fuels and nuclear power towards renewable energies [1]

  • Both pit mines are located in the Rhineland, where conditions for pumped hydro storage (PHS) power plants in abandoned pit mines prevail thanks to high exploration depth the best for PHS creating power plants inwater abandoned pitvolumes mines prevail thanks to high exploration and highconditions pit lake volumes, sizable storage without exceeding the lake level variation of 1 m/d

  • This study shows that a pumped storage hydropower plant in an open pit can be constructed at relatively low investment costs and could be operated profitably and with low specific production costs, if it were not for the long flooding time

Read more

Summary

Introduction

Germany is shifting its power production away from fossil fuels and nuclear power towards renewable energies [1]. With increasing wind and solar photovoltaic power supply fluctuations, security of supply, and long-term sustainability need to be managed [2]. One solution to this problem is the expansion of electricity storage capacities. Large areas and large height differences are required. PHS is placed in mountainous areas (e.g., in Austria, Switzerland, and Norway), often creating controversies due to their substantial socio-economic-ecological impacts. Potential locations for PHS are rare in Germany, but several lignite open-pit mines will cease operation in the years to come (due to the planned 100% phaseout of coal-fired power generation until 2035/2038), resulting in some areas being recultivated with large pit lakes. Height differences have been developed in the form of mine dumps

Objectives
Methods
Results
Conclusion