Abstract
Objectives: The economic feasibility and technical possibility of net-zero energy building in Tehran is conducted numerically in this research. Methods: The methods of numerical study and simulation were applied to calculate the economic feasibility and technical possibility of net-zero energy building in Tehran. The numerical method is conducted using C++ programming and simulation did by Hourly Analysis Program, and Poly Sun software. The results of simulation and programming are compared and presented. Findings: Simulation shows that the majority of energy which is needed for cooling and heating could be declined using insulation and better material for making building. It is observed that gas and electricity consumption stood at 50970 kW and 14772 kW, respectively. After insulation, Gas demand and electricity consumption declined dramatically to reach 23270 kW and 10574.6 kW, respectively. The calculation of Trombe wall, ground Heat Pump, Photovoltaic is conducted using simulation and C++ programming. The results of programming and simulation show that Solar collector can produce 10209.8 kWh/ year, and ground source Heat pump produces 7009.5 kWh/ year, Photovoltaic panels produce 58.06%of the total electricity demand. This system can provide 74% of heating and cooling load and 68.3% of total energy which is consumed in the building. Application and Improvement: The reduction of energy consumption in building is very important these days and it is possible by insulation and Trombe wall. The majority of energy consumption can be provided using renewable resources in the building. Keywords: Ground Source Heat Pump, Net-Zero Energy Building, Photovoltaic Panel
Highlights
Through these studies, scientists observed that the majority of final energy has been consumed by the building sector in the world
Overall heat loss coefficient of solar collector is calculated as 1.51 kWh/m2
Facility and HVAC facility are 10574.6kWh. this system can provide 58.06% of total device electricity year
Summary
Scientists observed that the majority of final energy has been consumed by the building sector in the world. This means that Domestic, commercial and official sectors used one out of three or one quarter of energy, which is produced in the world. COPc cooling coefficient of Tc ambient temperature (K) performance. COPh heating coefficient Td collector temperature (K) of performance. Te external temperature constructed the Trombe wall (k). Economic Feasibility and Technical Possibility of Net-Zero Energy Building in Tehran hi internal convection heat transfer (w/m2.K) ho external convection heat transfer (w/m2.K) Hz heat transfer coefficient of collector I radiation intensity
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.