Abstract

Each company, including RN-Yuganskneftegaz LLC, is interested in increasing profits and reducing the cost of mining. For this, various measures are used to obtain additional oil production, in particular: 1) commissioning of new wells; 2) acid hydro-fracturing of the formation; 3) reconstruction of wells. The main criterion in choosing the optimal method is the evaluation of economic efficiency. Aims and Objectives To hold economic efficiency analysis of measures for obtaining additional oil production on the basis of net present value (NPV). Results The presented results of technical and economic indicators and calculations of economic efficiency prove the feasibility of carrying out the measure to replace the electric centrifugal pump.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call